赖特强调通过换线和动态线路容量技术利用现有线路扩容,比新建线路更快。
我们利用现有输电线路而不是新建线路,因为新建太慢;我们进行导线更换,即换成能输送更多电力的主缆,并在其他线段采用动态线路容量技术。原文 (en)
we use existing power lines rather than building new ones because that's slow, and we do wire replacement, meaning we replace the main cable with one that can carry more electricity. And then on additional sections of cable, we implement dynamic line rating technology